The erosion control system includes a plurality of erosion control blocks connected to one another by connectors to form an interconnected network of erosion control blocks conforming to the underlying terrain for erosion prevention. Each erosion control block includes a plurality of apertures therethrough each forming a side wall. The connector includes a pair of projecting legs for insertion into adjacent erosion control blocks. Each leg attachingly engages the side wall of the aperture of an erosion control block for connecting that erosion control block to an adjacent block. The legs include tapered extensions which frictionally engage the side wall, and in one embodiment of the erosion control block, the side wall includes a shoulder which engages the terminal end of the tapered extension. The erosion control block may have one end with convex arcuate surface and another end with a concave arcuate surface for providing an articulating joint between adjacent erosion control blocks. The erosion control block also may include a plurality of horizontal hydraulic grooves in the bottom planar surface of the block for hydrostatic relief.
Shady Oak Data Center MSPData Center Facilities Engineer at GMAC RESCAP Retired from USAF in 1988, then joined NWA to be on design Team for new Data Center Design/Build, which was completed in 1990. I moved to American Express... Retired from USAF in 1988, then joined NWA to be on design Team for new Data Center Design/Build, which was completed in 1990. I moved to American Express Technology Center, Minneapolis and was a member of the Infrastructure Team from 2000-2003. I joined GMAC as Data Center Facility Engineer and...