Steven D. Gregory - Plano TX Christopher Wayne Bacon - Ada OK Robert Kent Pharr - Stonewall OK
Assignee:
Gregory Enterprise, Inc. - Garland TX
International Classification:
E02D 1702
US Classification:
405230, 405232, 405251, 403296
Abstract:
This invention relates to a system and method for supporting a building and to a system and method for connecting sections, such as pilings, pipes, conduits, and the like, in an end-to-end, abutting, relationship to form pilings for the support system.
Post Construction Alignment And Anchoring System And Method For Buildings
Steven D. Gregory - Plano TX, US Christopher Wayne Bacon - Ada OK, US Robert Kent Pharr - Stonewall OK, US
Assignee:
Gregory Enterprises, Inc. - Garland TX
International Classification:
E02D027/00
US Classification:
52296, 52146
Abstract:
A method for moving a wall from a first position to a second position and anchoring the wall in the second position, according to which a portion of an elongated assembly is placed through an opening in the wall. An auger is provided on one end portion of the assembly and torque is applied to the assembly to cause the auger to penetrate the ground, and a nut is advanced along the assembly to engage the wall and force the wall from the first position to the second position.
Preconstruction Anchoring System And Method For Buildings
A system and method of installing a preconstruction support system for a building, according to which the corresponding ends of two piling sections are connected together and an a auger is provided on one or more of the piling sections. The piling sections are driven into the ground in a manner so that a portion of the uppermost piling section extends above ground; and a concrete slab encases the portion of the piling sections.
Preconstruction Anchoring System And Method For Buildings
A system and method of installing a preconstruction support system for a building, according to which the corresponding ends of two piling sections are connected together and an a auger is provided on one or more of the piling sections. The piling sections are driven into the ground in a manner so that a portion of the uppermost piling section extends above ground; and a concrete slab encases the portion of the piling sections.
University of Texas at Arlington Arlington, TX Feb 2013 to Jul 2014 Bachelor of Science in NursingCerritos College School of Nursing Norwalk, CA Aug 2010 to May 2012 AssociatesXavier University of Louisiana New Orleans, LA May 2003 Bachelor of Science in Biology and Chemistry
Keeseville Elementary School Keeseville NY 1992-1995, Evergreen Elementary School Spokane WA 1994-1995, Northwood Junior High School Spokane WA 1994-1997, Ausable Valley High School Clintonville NY 1998-2002