- Milwaukee WI, US Christopher Glynne Townsend - Chandler AZ, US Ray O. Knoeppel - Hartland WI, US Brian T. Branecky - Oconomowoc WI, US Kedar D. Dimble - Milwaukee WI, US
International Classification:
F24H 9/00
Abstract:
A water heater includes a tank configured to hold a fluid, a sacrificial anode located within the tank, and a controller coupled to the sacrificial anode. The controller is configured to selectively complete and break an electrical circuit connecting the tank and the sacrificial anode. The controller is also configured to measure a shorted anode current through the electrical circuit, to determine a modulation duty cycle based on a current setpoint and the measured shorted anode current, and to repeatedly complete and break the electrical circuit using the modulation duty cycle.
Marvel Studios since Jul 2013
Visual Effects Supervisor
Marvel Studios Aug 2011 - Apr 2013
Visual Effects Supervisor
Marvel Studios Nov 2009 - May 2011
Visual Effects Supervisor
20th Century Fox Mar 2009 - Jan 2010
Visual Effects Supervisor
SP3DE 2009 - 2009
Post Production
10th & M Seafoods Anchorage, AK Apr 2014 to Sep 2014 Processer
Education:
Alaska Career College Anchorage, AK 2013 to 2014 Buisness admin/computer TechnologyOxnard College Oxnard, CA 1985 to 1986 ASE Brakes and Front End Repair. in Brakes and Front End RepairHueneme High School Oxnard, CA 1980 to 1984 College Prep
Skills:
Make use of Resources, Posssess good driving skills, proficient in Microsoft Ooofce programs, I am a good listener, Dependable,responsible, and honest.