Christopher H. Weis - Riverton UT, US Ronald K. Eyre - Orem UT, US Stewart N. Middlemiss - Salt Lake City UT, US David Iverson - Highland UT, US
Assignee:
Smith International, Inc - Houston TX
International Classification:
C04B 35/52 C04B 35/5831
US Classification:
264672, 175428
Abstract:
A method for manufacturing an ultrahard compact includes assembling a mass of ultrahard material with a mass of substrate material such that the mass of ultrahard material extends radially outward a greater extent than the substrate material to compensate for a difference in the radial shrinkage of the ultrahard material compared to the substrate material during a sintering process. The method may further includes subjecting the assembled compact to a high pressure high temperature process that results in the forming of an ultrahard compact including an ultrahard layer integrally bonded with a substrate.
A method for manufacturing an ultrahard compact includes assembling a mass of ultrahard material with a mass of substrate material such that the mass of ultrahard material extends radially outward a greater extent than the substrate material to compensate for a difference in the radial shrinkage of the ultrahard material compared to the substrate material during a sintering process. The method may further includes subjecting the assembled compact to a high pressure high temperature process mat results in the forming of an ultrahard compact including an ultrahard layer integrally bonded with a substrate.
Williams May 2012 - Feb 2014
Staff Project Developer
Silver Sage Ranch Jan 1993 - Aug 2002
Ranch Hand
Education:
Colorado School of Mines 2006 - 2007
Master of Science, Masters, Management, Engineering
Colorado School of Mines 2002 - 2006
Bachelors, Bachelor of Science, Engineering, Physics
Project Management Institute
Skills:
Engineering Energy Project Management Pipelines Project Planning Project Engineering Process Engineering Contract Negotiation Forecasting Natural Gas Strategic Planning Upstream Gas Energy Industry Oil and Gas Financial Analysis Petroleum Construction Troubleshooting Optimization Microsoft Word Management Microsoft Excel Risk Assessment Business Development Economic Analysis Stage Gate Process Development Microsoft Office Powerpoint Microsoft Project Visual Basic For Applications Primavera P6 Project Development Asset Acquisition Asset Evaluation Risk Analysis Competitive Analysis Process Optimization Team Leadership Aspen Hysys Promax Collaboration Solutions Budgeting Project Evaluation Visio Oracle E Business Suite