South Miami Gynecologic Oncology Group 8585 Sunset Dr STE 202, Miami, FL 33143 (305)6661811 (phone), (305)6661801 (fax)
Education:
Medical School University of Miami, Miller School of Medicine Graduated: 2006
Procedures:
Tubal Surgery Cesarean Section (C-Section) Hysterectomy Ovarian Surgery Vaginal Delivery Vaginal Repair
Conditions:
Genital HPV Uterine Leiomyoma Abnormal Vaginal Bleeding Conditions of Pregnancy and Delivery Endometriosis
Languages:
English Spanish
Description:
Dr. Schroeder graduated from the University of Miami, Miller School of Medicine in 2006. He works in South Miami, FL and specializes in Gynecologic Oncology. Dr. Schroeder is affiliated with Baptist Hospital Of Miami, Kendall Regional Medical Center, South Miami Hospital and Westchester General Hospital.
Dr. Schroeder graduated from the University of New Mexico School of Medicine in 2004. He works in South Miami, FL and specializes in Interventional Cardiology and Cardiovascular Disease. Dr. Schroeder is affiliated with South Miami Hospital.
Richard Hull - Puyallup WA Eric Schroeder - Tempe AZ
Assignee:
Microchip Technology Incorporated - Chandler AZ
International Classification:
H03K 190175
US Classification:
326 83, 326 80
Abstract:
A multipurpose input/output circuit providing full input output current drive capability and special mode selection on a single device pin. The circuit includes first and second high voltage detectors coupled to the pin, at least one pin bias circuit, and a mode selector. The mode selector determines whether the pin operates as either an input or output. One of the high voltage detectors detects a high voltage on the pin and causes the bias circuit to disconnect the pin from the supply voltage. The other high voltage detector operates to detect a special mode voltage on the pin and set the device into a special mode.
Detection And Correction Of Robotic Process Automation Failures
- Santa Clara CA, US Manjeet Singh - Santa Clara CA, US Praveen Minnikaran Damodaran - Hyderabad, IN Eric Schroeder - San Diego CA, US Binny Bhatnagar - Pleasanton CA, US
International Classification:
G05B 23/02 G06N 20/00 G05B 17/02
Abstract:
An example embodiment involves rules related to repairing software programs, wherein the rules associate indications of software program failures with repair applications that are configured to correct the software program failures. One or more processors are configured to: (i) receive, by a predictive model, a representation of an execution history of a particular software program, wherein the predictive model has been trained on a corpus of execution histories of the software programs; (ii) generate, by the predictive model and from the execution history, a failure prediction for the particular software program; (iii) receive, by an automated repair controller application, the failure prediction from the predictive model; (iv) based on applying the rules to the failure prediction, determine, by the automated repair controller application, a repair application from the repair applications; and (v) cause, by the automated repair controller application, the repair application to be executed within the network.
Proactive Notifications For Robotic Process Automation
- Santa Clara CA, US Praveen Minnikaran Damodaran - Hyderabad, IN Eric Schroeder - San Diego CA, US Binny Bhatnagar - Pleasanton CA, US
International Classification:
G06F 8/65
Abstract:
An example embodiment involves persistent storage defining a first configuration item representing an application deployed within a network, a second configuration item representing a software program that is deployable within the network, and a relationship between the first configuration item and the second configuration item. One or more processors may be configured to: (i) receive an indication that a change has been applied to the application or has been arranged to be applied to the application; (ii) identify the relationship between the first configuration item and the second configuration item; (iii) based on the relationship between the first configuration item and the second configuration item, determine that the change can affect operation of the software program; and (iv) in response to determining that the change can affect operation of the software program, provide a notification of the change to an agent associated with the software program.
- Santa Clara CA, US Eric Schroeder - San Diego CA, US Bryan Boyle - San Diego CA, US Myke Lyons - Haworth NJ, US
Assignee:
ServiceNow, Inc. - Santa Clara CA
International Classification:
H04L 12/24 G06Q 30/02 H04L 29/08
Abstract:
A post incident analysis system and method includes a system management module coupled to a communications link and digital data storage containing a database of multiple survey questions, each question associated with an application criteria statement and auto populate instructions. The module conducts post incident analysis responsive to a network incident. After the incident receives a given status, the module generates a post incident survey. Survey questions are identified by applying the application criteria statement associated with each question. The module pre-completes selected ones of the identified survey questions by executing the auto populate instructions associated with the selected survey question to identify and retrieve answers to the question from predefined data sources specified in the auto populate instructions. The post incident survey includes, at minimum, survey questions for which the pre-completion was not successful. The survey is transmitted to the participants via the link.
PRA International Lenexa, KS Nov 2011 to Mar 2012 Lead Document Management AssociateDick's Sporting Goods Merriam, KS Feb 2007 to Oct 2011 Operations Manager/Freight Flow LeadSpirit Halloween Shawnee, KS Aug 2006 to Nov 2006 Store ManagerStore ManagerLawrence, KS Apr 2006 to Aug 2006
Education:
Johnson County Community College Overland Park, KS May 2011 Liberal ArtsNational Academy of Railroad Sciences Overland Park, KS Dec 2006
Offensively, Middletown had success through the air with a pair of Kellen Davis touchdown tosses and three rushing scores from Lemond Chambers, who ran for 84 yards on nine attempts. Eric Schroeder led the Middies with 94 yards on the ground over 16 attempts. Loveland, which had one of the ECC's to
Athletic Testing Solutions (ATS), is a group of medical professionals brought together to provide comprehensive testing services specializing in sudden cardiac arrest. Our management team has over 20 ...
Tagline:
Testing Saves Lives
Eric Schroeder
Lived:
Olathe, KS
Work:
Athletic Testing Solutions - Executive Vice President (2009)
Eric Schroeder
Work:
FBC Boerne - Media Tech (2002)
Education:
Texas A&M University - BMEN and MEEN
Eric Schroeder
Work:
U.S. Navy - EDMC (1992)
Tagline:
Living the dream, one day at a time!
Eric Schroeder
Education:
University of Maryland, College Park - Aerospace Engineering