Lake Silverado CardiovascularSaint Helena Family Health Center Advanced Heart Institute 6 Woodland Rd STE 307, Saint Helena, CA 94574 (707)9632759 (phone), (707)9950904 (fax)
Adventist Heart Institute Cardiovascular Surgery 10 Woodland Rd STE 304, Saint Helena, CA 94574 (707)9633611 (phone), (707)9637203 (fax)
Saint Helena Cardiology 15250 Lakeshore Dr STE C, Clearlake, CA 95422 (707)9957077 (phone), (707)9950904 (fax)
Education:
Medical School Seoul Natl Univ, Coll of Med, Chongno Ku, Seoul, So Korea Graduated: 1977
Procedures:
Angioplasty Cardiac Stress Test Cardioversion Echocardiogram Cardiac Catheterization Continuous EKG Pacemaker and Defibrillator Procedures
Dr. Park graduated from the Seoul Natl Univ, Coll of Med, Chongno Ku, Seoul, So Korea in 1977. He works in Saint Helena, CA and 2 other locations and specializes in Cardiovascular Disease and Interventional Cardiology. Dr. Park is affiliated with Saint Helena Hospital and Saint Helena Hospital Clearlake.
Name / Title
Company / Classification
Phones & Addresses
Jeong Park Principal
Joy Nail Beauty Shop
3120 Bainbridge Ave, Bronx, NY 10467
Jeong Park Principal
JW WIRELESS, LLC Radiotelephone Communication
3332 Buford Hwy, Atlanta, GA 30329
Jeong Park Principal
Beauty Empire Beauty Shop
3711 Austell Rd SW, Marietta, GA 30008 3701 Austell Rd SW STE 105, Marietta, GA 30008 (770)4329711
Jeong S. Park Chief Executive Officer
Atl World Outreach Church Religious Organization
2227 Duluth Hwy 120, Duluth, GA 30097
Jeong E Park
DJ & SON SEAFOOD CORP
1575 Central Park Ave, Yonkers, NY 10710 32 Tall Tulip Ln, Yonkers, NY 10710
Jeong Park Principal
Q & S Sign Corp Ret Misc Merchandise Whol Durable Goods Mfg Signs/Advertising Specialties
Thomas E. Ganley - Novi MI, US Sean W. McGrogan - Ann Arbor MI, US Jeong J. Park - Ann Arbor MI, US Anthony H. Heap - Ann Arbor MI, US
Assignee:
GM Global Technology Operations LLC - Detroit MI
International Classification:
B60L 9/00 B60L 11/00 B60K 1/00
US Classification:
701 22, 180 651
Abstract:
A powertrain system includes an internal combustion engine and an electric machine coupled via a torque transfer device to a transmission. A method for operating the powertrain system to transfer torque to a driveline includes establishing an operating torque security limit that is a default torque security limit. The operating torque security limit is set to an override limit when engine speed is less than a threshold speed. A torque security fault is detected only when a combined torque output from the internal combustion engine and the electric machine to the torque transfer device deviates from an operator torque request by an amount greater than the operating torque security limit.
Two-Phase Fuel Emission System For Spark Ignited Engine
Chung M. Suh - Farmington Hills MI Jeong J. Park - Farmington Hills MI
Assignee:
Kia Motors Corporation - Seoul
International Classification:
F02B 100
US Classification:
1231798
Abstract:
An internal combustion engine having a pollution control system with a catalytic converter using a two-phase fuel system in which a small supply of flammable gaseous fuel is used for ignition and initial start-up of the engine. As the engine is warmed up and the catalytic converter is heated, the gaseous fuel is phased out and the liquid fuel is phased in.
Frank Fiske (1971-1975), Jeong Park (1988-1992), Kenya Grant (1984-1988), Joseph Dicostanzo (1993-1997), Iljaz Lazi (2003-2007), Per Dyrvik (1978-1982)