Lake Silverado CardiovascularSaint Helena Family Health Center Advanced Heart Institute 6 Woodland Rd STE 307, Saint Helena, CA 94574 (707)9632759 (phone), (707)9950904 (fax)
Adventist Heart Institute Cardiovascular Surgery 10 Woodland Rd STE 304, Saint Helena, CA 94574 (707)9633611 (phone), (707)9637203 (fax)
Saint Helena Cardiology 15250 Lakeshore Dr STE C, Clearlake, CA 95422 (707)9957077 (phone), (707)9950904 (fax)
Education:
Medical School Seoul Natl Univ, Coll of Med, Chongno Ku, Seoul, So Korea Graduated: 1977
Procedures:
Angioplasty Cardiac Stress Test Cardioversion Echocardiogram Cardiac Catheterization Continuous EKG Pacemaker and Defibrillator Procedures
Dr. Park graduated from the Seoul Natl Univ, Coll of Med, Chongno Ku, Seoul, So Korea in 1977. He works in Saint Helena, CA and 2 other locations and specializes in Cardiovascular Disease and Interventional Cardiology. Dr. Park is affiliated with Saint Helena Hospital and Saint Helena Hospital Clearlake.
Name / Title
Company / Classification
Phones & Addresses
Jeong Soo Park TREASURER
LG ELECTRONICS AL INC TO ENGAGE IN SERVICING OF TELEVISIONS, MOBILE PHONES, ELECTRIC AND ELECTRONIC HOME APPLIANCES AND PARTS SALES
201 James Record Rd, Huntsville, AL 920 Sylvan Ave, Englewood Cliffs, NJ 07632
License Records
Jeong Kil Park
License #:
6836 - Expired
Category:
Asbestos
Issued Date:
Sep 9, 2004
Effective Date:
Sep 19, 2005
Expiration Date:
Sep 9, 2005
Type:
Asbestos Worker
Jeong Kil Park
License #:
5665 - Expired
Category:
Asbestos
Issued Date:
Aug 11, 1999
Effective Date:
Jul 26, 2004
Expiration Date:
Aug 11, 2000
Type:
Asbestos Worker
Us Patents
Method And Apparatus For Managing Torque In A Hybrid Powertrain System
Thomas E. Ganley - Novi MI, US Sean W. McGrogan - Ann Arbor MI, US Jeong J. Park - Ann Arbor MI, US Anthony H. Heap - Ann Arbor MI, US
Assignee:
GM Global Technology Operations LLC - Detroit MI
International Classification:
B60L 9/00 B60L 11/00 B60K 1/00
US Classification:
701 22, 180 651
Abstract:
A powertrain system includes an internal combustion engine and an electric machine coupled via a torque transfer device to a transmission. A method for operating the powertrain system to transfer torque to a driveline includes establishing an operating torque security limit that is a default torque security limit. The operating torque security limit is set to an override limit when engine speed is less than a threshold speed. A torque security fault is detected only when a combined torque output from the internal combustion engine and the electric machine to the torque transfer device deviates from an operator torque request by an amount greater than the operating torque security limit.
Two-Phase Fuel Emission System For Spark Ignited Engine
Chung M. Suh - Farmington Hills MI Jeong J. Park - Farmington Hills MI
Assignee:
Kia Motors Corporation - Seoul
International Classification:
F02B 100
US Classification:
1231798
Abstract:
An internal combustion engine having a pollution control system with a catalytic converter using a two-phase fuel system in which a small supply of flammable gaseous fuel is used for ignition and initial start-up of the engine. As the engine is warmed up and the catalytic converter is heated, the gaseous fuel is phased out and the liquid fuel is phased in.
Frank Fiske (1971-1975), Jeong Park (1988-1992), Kenya Grant (1984-1988), Joseph Dicostanzo (1993-1997), Iljaz Lazi (2003-2007), Per Dyrvik (1978-1982)