Method and apparatus for enhancing removal of corrosion products from a nuclear reactor piping system. A reagent is supplied into a multi-part reactor piping system to react with the corrosion products therein. The corrosion products dissolve into the reagent to define a contaminated solution. The contaminated solution is brought into contact with an ion exchange resin bed that absorbs the corrosion products from the contaminated solution to define a reagent-containing contaminant-free solution. In this regard, a circulation pump having a predetermined net positive suction head (NPSH) interconnects the system with the resin bed for pumping the contaminated solution from one part of the reactor piping system and into contact with the resin bed and thereafter pumping the contaminant-free solution from the resin bed and to another part of the reactor piping system to remove the corrosion products. Moreover, a gas injector injects a pressurized gas into the reactor system to pressurize the reactor system to a predetermined pressure necessary to maintain the NPSH during transfer of the contaminant-free solution from one part of the piping system to another part of the piping system. During each transfer, the pump brings substantially all contaminated solution into contact with the resin bed as it removes substantially all the corrosion products from the piping system.
Jun 2010 to 2000Morris Alternatives Spartansburg, PA Mar 2006 to Nov 2010 SalesPro Cable Services Pittsburgh, PA Jun 2010 to Oct 2010 Telecommunication TechnicianMorris Alternatives Corry, PA Nov 2008 to Feb 2009Morris Alternatives Corry, PA Sep 2007 to Nov 2008IUE/CWA Local Corry, PA Jul 2003 to Nov 2008 Sgt. of ArmsMorris Alternatives Corry, PA Feb 2003 to Sep 2007 Process Tech. TraineeIUE/ CWA Local Corry, PA Oct 1999 to Jun 2003 Shipping StewardMorris Alternatives Corry, PA Oct 2001 to Feb 2003 Tool Crib Attendant / ShipperMorris Alternatives Corry, PA Sep 2001 to Oct 2001 ShipperMorris Alternatives Corry, PA Feb 1999 to Sep 2001 CDL/ ShipperMorris Alternatives Corry, PA Oct 1997 to Jan 1999 ShipperMorris Alternatives Corry, PA Jul 1997 to Sep 1997 Press OperatorMorris Alternatives Corry, PA Feb 1995 to Jul 1997 Press Operator / Shipper
Education:
Precision Manufacturing Institute Meadville, PA Jul 2007 to Aug 2007 Intro to Process IIPrecision Manufacturing Institute Meadville, PA Dec 2005 to Dec 2005 Intro To Mold Repair w/ machining operationPrecision Manufacturing Institute Meadville, PA Oct 2005 to Dec 2005 Intro to ProcessingPrecision Manufacturing Institute Meadville, PA Mar 2005 to May 2005 Mold Set-UpGeneral Vo-tech, Venango Vocational Technical School Oil City, PA Sep 1995 to Jun 1996 Vocational in WeldingTitusville Jr. Sr. High School Titusville, PA Sep 1992 to Jun 1996 DiplomaVenango Vocational Technical School Oil City, PA Sep 1993 to Jun 1995 Vocational
The situation is just going to get worse and worse as time goes on, said Ronald Morris, a maintenance supervisor at the facility and the president of the local union that represent workers at the prison.