Eric Pierce - Portland OR, US Jason Hill - Portland OR, US James Tillett - Portland OR, US Dave Walden - Long Beach CA, US Laura Raymond - Houston TX, US Chris Hickman - Austin TX, US Phong Do - Austin TX, US
Assignee:
INNOVARI, INC. - Austin TX
International Classification:
G05B 13/02
US Classification:
700276, 700296, 700291
Abstract:
Data comprising a request specifying a desired change in electrical load for a defined period of time is received. The electrical load is associated with a plurality of resources under control of resource agents and on a utility grid. Available capacity of resources within the control of each resource agent over the defined period of time is determined. Each available capacity is determined at least using a resource load model. Using the determined available capacity of resources over the defined period of time, resource scheduling instructions are calculated for a subset of resources. The resource scheduling instructions satisfy the desired change in electrical load of the request. Data characterizing the resource scheduling instructions is provided. Related systems, apparatus, methods, and articles are also described.
- Hillsboro OR, US David Walden - Austin TX, US Chris Hickman - Lone Tree CO, US Robin Jensen Lunt - Parker CO, US Jason Hill - Portland OR, US Eric Pierce - Portland OR, US Nathan Ronald Ortega - Lake Oswego OR, US Phong Do - Austin TX, US James Tillett - Portland OR, US
International Classification:
G05F 1/66 G05B 15/02
Abstract:
The subject matter described herein relates to the organized measurement, dispatch and/or control of disparate and distributed resources along the length of and at the ends of the electrical grid. Related systems, apparatus, methods, and articles are also described.
- Austin TX, US Eric Pierce - Portland OR, US Jason Hill - Portland OR, US James Tillett - Portland OR, US David Walden - Long Beach CA, US Laura V. Raymond - Houston TX, US Chris Hickman - Austin TX, US Phong Do - Austin TX, US
Assignee:
INNOVARI, INC. - Austin TX
International Classification:
G05B 13/02
US Classification:
700296
Abstract:
Data comprising a request specifying a desired change in electrical load for a defined period of time is received. The electrical load is associated with a plurality of resources under control of resource agents and on a utility grid. Available capacity of resources within the control of each resource agent over the defined period of time is determined. Each available capacity is determined at least using a resource load model. Using the determined available capacity of resources over the defined period of time, resource scheduling instructions are calculated for a subset of resources. The resource scheduling instructions satisfy the desired change in electrical load of the request. Data characterizing the resource scheduling instructions is provided. Related systems, apparatus, methods, and articles are also described.